Site report: 250,000 cubic metres of concrete pumped in precast factory
For the past 4½ years Camfaud has been providing concrete pump services at Tarmac precast’s factory in Tallington near Stamford, Lincolnshire. Over this period, we have pumped very close to 250,000 cubic metres of conc
Site report: Renewable energy project at Kessingland Wind Farm
There is a growing market for the construction industry in the renewable energy sector and the most visible sign of this growth is the proliferation of wind farms throughout the country. One area reaping the benefit of this d