5,000 cubic metre, 36 hour continuous pour
We recently pumped approximately 5,000 cubic metres of concrete into the basement of One Nine Elms, a mixed-use skyscraper development in South West London. Camfaud supplied four pumps, two Putzmeister pumps and two Schwing p