Gull Wing Bridge project
When Main Contractor Farrans Construction needed to pour over 600m3 of concrete into the Cofferdam Base, for Pier 5 on the Gull Wing Bridge project at Lowestoft, Suffolk, there was only one supplier to call. Camfaud supplied