Gull Wing Bridge project
When Main Contractor Farrans Construction needed to pour over 600m3 of concrete into the Cofferdam Base, for Pier 5 on the Gull Wing Bridge project at Lowestoft, Suffolk, there was only one supplier to call. Camfaud supplied
When Main Contractor Farrans Construction needed to pour over 600m3 of concrete into the Cofferdam Base, for Pier 5 on the Gull Wing Bridge project at Lowestoft, Suffolk, there was only one supplier to call. Camfaud supplied